Short answer: In 2026, a standard broom-finish concrete driveway in Wilmington, NC typically costs $13 to $16 per square foot installed, including tear-out of a typical existing driveway. A 1-car driveway of about 300 sq ft runs $3,900–$4,800, a 2-car driveway of 600 sq ft $7,800–$9,600, and a large 900 sq ft driveway $11,700–$14,400. Stamped driveways cost $20–$33 per sq ft.
Concrete driveway prices by size
These ranges come from our recent driveway projects in New Hanover, Brunswick, Pender and Onslow counties. They include tear-out of a typical old driveway, grading, compacted base, forms, reinforcement, 3,500–4,000 PSI concrete, broom finish and saw-cut control joints.
| Driveway | Typical size | Broom finish | Stamped |
|---|---|---|---|
| 1 car | 250–350 sq ft | $3,250–$5,600 | $5,000–$11,550 |
| 2 cars | 500–700 sq ft | $6,500–$11,200 | $10,000–$23,100 |
| 3 cars or long drive | 800–1,200 sq ft | $10,400–$19,200 | $16,000–$39,600 |
| Parking pad / extension | 150–300 sq ft | $1,950–$4,800 | $3,000–$9,900 |
What makes a driveway cost more (or less)
- Tear-out: removing old concrete or asphalt is usually included; very thick slabs or large areas of broken concrete can add $1–$3 per sq ft.
- Thickness and steel: 4" with fiber or mesh is standard for cars; 5"–6" with rebar for trucks, RVs and boat trailers costs more.
- Grading and drainage: low spots, water against the garage or a slope to the street may need extra fill and grading.
- Street apron and permits: a new curb cut or apron in the right-of-way may need a city, county or NCDOT permit.
- Finish: broom finish is the base price; stamped borders or a fully stamped driveway are priced as stamped concrete.
When is it time to replace your driveway?
If panels have sunk, lifted near the garage, hold water or are breaking into pieces, the base underneath has failed and a surface patch will not last. Replacing the driveway — or only the damaged sections — fixes the base and gives you another 30+ years.
Concrete vs. asphalt driveway in coastal NC
Asphalt usually costs less up front, but in the Wilmington heat it softens, needs sealing every few years and typically lasts 15–20 years. A well-built concrete driveway lasts 30+ years with very little upkeep, stays cooler in summer and adds more curb appeal — which is why most homeowners we work with choose concrete when they replace.
How to get an exact price
Every driveway is different. MJ Profesional Concrete gives free on-site estimates in Wilmington, Leland and nearby towns, with a written, line-item quote that shows thickness, reinforcement and mix so you can compare it with any other bid.